Ch 26 Steves RD over Trib Big Four Ditch
GoodFord County, Illinois · 120N 1500E · Structure no. 027343900000000
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 46 ft
- 1 main span
- Daily traffic
- 250
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Ch 26 Steves RD over Trib Big Four Ditch is a prestressed concrete box beam or girders - multiple carrying Ch 26 Steves RD over Trib Big Four Ditch in Ford County, Illinois. It was built in 2009, so it is 16 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 250 vehicles a day, roughly 8% of them trucks, projected to reach 152 by 2046. The structure is 46 ft (14.1 m) long and 27 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ch 26 Steves RD over Trib Big Four Ditch built?
It was built in 2009, making it 16 years old in 2025.
What condition is Ch 26 Steves RD over Trib Big Four Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Ch 26 Steves RD over Trib Big Four Ditch carry?
About 250 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is Ch 26 Steves RD over Trib Big Four Ditch?
The structure is 46 ft (14.1 m) long with a longest span of 44 ft (13.4 m) and a deck 27 ft wide.
Who owns Ch 26 Steves RD over Trib Big Four Ditch?
It is owned by the County Highway Agency.