US Bridges

TR 121 Button over M.Fk.Vermilion River

Fair

Ford County, Illinois · 2350E 00N · Structure no. 027329900000000

Built
1970
55 years old
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
192 ft
3 main spans
Daily traffic
75
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 121 Button over M.Fk.Vermilion River is a steel continuous stringer/multi-beam or girder carrying TR 121 Button over M.Fk.Vermilion River in Ford County, Illinois. It was built in 1970, so it is 55 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 75 vehicles a day, projected to reach 76 by 2046. The structure is 192 ft (58.5 m) long and 29 ft wide. If it were closed, the detour would be 11.2 mi (18 km).

CarriesTR 121 Button
CrossesM.Fk.Vermilion River
Location2350E 00N
RouteCounty Highway 0
Coordinates40.40047, -88.01214
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.3 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 15
Structure length192 ft (58.5 m)
Longest span69 ft (21 m)
Deck width29 ft (8.7 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2021)
Projected traffic76 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 121 Button over M.Fk.Vermilion River built?

It was built in 1970, making it 55 years old in 2025.

What condition is TR 121 Button over M.Fk.Vermilion River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does TR 121 Button over M.Fk.Vermilion River carry?

About 75 vehicles per day (2021 count).

How long is TR 121 Button over M.Fk.Vermilion River?

The structure is 192 ft (58.5 m) long with a longest span of 69 ft (21 m) and a deck 29 ft wide.

Who owns TR 121 Button over M.Fk.Vermilion River?

It is owned by the Town or Township Highway Agency.