US Bridges

TR 2 Mona over Stream

Fair

Ford County, Illinois · 3420 N 1800E · Structure no. 027329100000000

Built
1964
61 years old
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
106 ft
3 main spans
Daily traffic
50
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 2 Mona over Stream is a steel continuous stringer/multi-beam or girder carrying TR 2 Mona over Stream in Ford County, Illinois. It was built in 1964, so it is 61 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, projected to reach 51 by 2046. The structure is 106 ft (32.3 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTR 2 Mona
CrossesStream
Location3420 N 1800E
RouteCounty Highway 0
Coordinates40.89813, -88.12952
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.6 US tons
Inventory rating38.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 15
Structure length106 ft (32.3 m)
Longest span38 ft (11.6 m)
Deck width24 ft (7.4 m)
Roadway width20 ft (6.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2022)
Projected traffic51 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 2 Mona over Stream built?

It was built in 1964, making it 61 years old in 2025.

What condition is TR 2 Mona over Stream in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does TR 2 Mona over Stream carry?

About 50 vehicles per day (2022 count).

How long is TR 2 Mona over Stream?

The structure is 106 ft (32.3 m) long with a longest span of 38 ft (11.6 m) and a deck 24 ft wide.

Who owns TR 2 Mona over Stream?

It is owned by the Town or Township Highway Agency.