Ch 4 Elliott RD over The Big Four
FairFord County, Illinois · 1080E 800N · Structure no. 027300500000000
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 95 ft
- 1 main span
- Daily traffic
- 400
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Ch 4 Elliott RD over The Big Four is a steel stringer/multi-beam or girder carrying Ch 4 Elliott RD over The Big Four in Ford County, Illinois. It was built in 1955, so it is 70 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 400 vehicles a day, roughly 9% of them trucks, projected to reach 354 by 2046. The structure is 95 ft (29 m) long and 27 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ch 4 Elliott RD over The Big Four built?
It was built in 1955, making it 70 years old in 2025.
What condition is Ch 4 Elliott RD over The Big Four in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Ch 4 Elliott RD over The Big Four carry?
About 400 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is Ch 4 Elliott RD over The Big Four?
The structure is 95 ft (29 m) long with a longest span of 61 ft (18.6 m) and a deck 27 ft wide.
Who owns Ch 4 Elliott RD over The Big Four?
It is owned by the County Highway Agency.