FAP-750 (ILL-185) over Sandy Run Creek
FairFayette County, Illinois · 2 MI E Bluff City · Structure no. 026009100000000
- Built
- 1985
- 40 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 70 ft
- 1 main span
- Daily traffic
- 1,200
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAP-750 (ILL-185) over Sandy Run Creek is a steel stringer/multi-beam or girder carrying FAP-750 (ILL-185) over Sandy Run Creek in Fayette County, Illinois. It was built in 1985, so it is 40 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,200 vehicles a day, roughly 14% of them trucks, projected to reach 1,122 by 2046. The structure is 70 ft (21.3 m) long and 35 ft wide. If it were closed, the detour would be 52.8 mi (85 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP-750 (ILL-185) over Sandy Run Creek built?
It was built in 1985, making it 40 years old in 2025.
What condition is FAP-750 (ILL-185) over Sandy Run Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does FAP-750 (ILL-185) over Sandy Run Creek carry?
About 1,200 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is FAP-750 (ILL-185) over Sandy Run Creek?
The structure is 70 ft (21.3 m) long with a longest span of 69 ft (21 m) and a deck 35 ft wide.
Who owns FAP-750 (ILL-185) over Sandy Run Creek?
It is owned by the State Highway Agency.