US Bridges

FAP-95 (ill 33) over Bishop Creek

Fair

Effingham County, Illinois · 1 M NW Dieterich · Structure no. 025009700000000

Built
2007
18 years old
Condition
Fair
inspected January 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
54 ft
1 main span
Daily traffic
6,700
2023 count
Owner
State
State Highway Agency

About this bridge

FAP-95 (ill 33) over Bishop Creek is a prestressed concrete stringer/multi-beam or girder carrying FAP-95 (ill 33) over Bishop Creek in Effingham County, Illinois. It was built in 2007, so it is 18 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,700 vehicles a day, roughly 17% of them trucks, projected to reach 6,519 by 2046. The structure is 54 ft (16.5 m) long and 43 ft wide. If it were closed, the detour would be 42.9 mi (69 km).

CarriesFAP-95 (ill 33)
CrossesBishop Creek
Location1 M NW Dieterich
RouteState Highway 33
Coordinates39.07274, -88.41041
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.4 US tons
Inventory rating43.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length54 ft (16.5 m)
Longest span54 ft (16.5 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,700 (2023)
Projected traffic6,519 by 2046
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed42.9 mi (69 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAP-95 (ill 33) over Bishop Creek built?

It was built in 2007, making it 18 years old in 2025.

What condition is FAP-95 (ill 33) over Bishop Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2022.

How much traffic does FAP-95 (ill 33) over Bishop Creek carry?

About 6,700 vehicles per day (2023 count), of which roughly 17% are trucks.

How long is FAP-95 (ill 33) over Bishop Creek?

The structure is 54 ft (16.5 m) long with a longest span of 54 ft (16.5 m) and a deck 43 ft wide.

Who owns FAP-95 (ill 33) over Bishop Creek?

It is owned by the State Highway Agency.