FAP-95 (ILL-33) over Little Salt Creek
FairEffingham County, Illinois · 2.5 MI NW Dietrich · Structure no. 025008200000000
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 151 ft
- 3 main spans
- Daily traffic
- 7,500
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAP-95 (ILL-33) over Little Salt Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying FAP-95 (ILL-33) over Little Salt Creek in Effingham County, Illinois. It was built in 1977, so it is 48 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,500 vehicles a day, roughly 17% of them trucks, projected to reach 7,314 by 2046. The structure is 151 ft (46.1 m) long and 46 ft wide. If it were closed, the detour would be 42.9 mi (69 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP-95 (ILL-33) over Little Salt Creek built?
It was built in 1977, making it 48 years old in 2025.
What condition is FAP-95 (ILL-33) over Little Salt Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does FAP-95 (ILL-33) over Little Salt Creek carry?
About 7,500 vehicles per day (2023 count), of which roughly 17% are trucks.
How long is FAP-95 (ILL-33) over Little Salt Creek?
The structure is 151 ft (46.1 m) long with a longest span of 50 ft (15.2 m) and a deck 46 ft wide.
Who owns FAP-95 (ILL-33) over Little Salt Creek?
It is owned by the State Highway Agency.