FAP-328 (US-45) over Bishop Creek
FairEffingham County, Illinois · 5 MI S ILL-37 JCT · Structure no. 025008000000000
- Built
- 1977
- 48 years old, rebuilt 2020
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 189 ft
- 3 main spans
- Daily traffic
- 3,150
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAP-328 (US-45) over Bishop Creek is a steel continuous stringer/multi-beam or girder carrying FAP-328 (US-45) over Bishop Creek in Effingham County, Illinois. It was built in 1977 and reconstructed in 2020, so it is 48 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,150 vehicles a day, roughly 12% of them trucks, projected to reach 2,862 by 2046. The structure is 189 ft (57.6 m) long and 46 ft wide. If it were closed, the detour would be 67.7 mi (109 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP-328 (US-45) over Bishop Creek built?
It was built in 1977, making it 48 years old in 2025. It was reconstructed in 2020.
What condition is FAP-328 (US-45) over Bishop Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does FAP-328 (US-45) over Bishop Creek carry?
About 3,150 vehicles per day (2023 count), of which roughly 12% are trucks.
How long is FAP-328 (US-45) over Bishop Creek?
The structure is 189 ft (57.6 m) long with a longest span of 68 ft (20.7 m) and a deck 46 ft wide.
Who owns FAP-328 (US-45) over Bishop Creek?
It is owned by the State Highway Agency.