FAS-813 (CH-1) over Big Creek
GoodEdwards County, Illinois · 1.75 MI S Bone Gap · Structure no. 024311400000000
- Built
- 1991
- 34 years old
- Condition
- Good
- inspected February 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 41 ft
- 1 main span
- Daily traffic
- 450
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
FAS-813 (CH-1) over Big Creek is a prestressed concrete box beam or girders - multiple carrying FAS-813 (CH-1) over Big Creek in Edwards County, Illinois. It was built in 1991, so it is 34 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 450 vehicles a day, roughly 5% of them trucks, projected to reach 606 by 2046. The structure is 41 ft (12.6 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS-813 (CH-1) over Big Creek built?
It was built in 1991, making it 34 years old in 2025.
What condition is FAS-813 (CH-1) over Big Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2022.
How much traffic does FAS-813 (CH-1) over Big Creek carry?
About 450 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is FAS-813 (CH-1) over Big Creek?
The structure is 41 ft (12.6 m) long with a longest span of 39 ft (11.8 m) and a deck 28 ft wide.
Who owns FAS-813 (CH-1) over Big Creek?
It is owned by the County Highway Agency.