US Bridges

FAP 116 (il 130) over Stream

Good

Edwards County, Illinois · 2.75 MI S Albion · Structure no. 024200800000000

Built
2016
9 years old
Condition
Good
inspected August 2022
Type
Culvert
Concrete
Length
35 ft
2 main spans
Daily traffic
3,450
2023 count
Owner
State
State Highway Agency

About this bridge

FAP 116 (il 130) over Stream is a concrete culvert carrying FAP 116 (il 130) over Stream in Edwards County, Illinois. It was built in 2016, so it is 9 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,450 vehicles a day, roughly 29% of them trucks, projected to reach 3,838 by 2046. The structure is 35 ft (10.7 m) long and 52 ft wide. If it were closed, the detour would be 31.7 mi (51 km).

CarriesFAP 116 (il 130)
CrossesStream
Location2.75 MI S Albion
RouteState Highway 130
Coordinates38.33882, -88.02656
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionAugust 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86.1 US tons
Inventory rating66.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 25 or greater
Structure length35 ft (10.7 m)
Longest span35 ft (10.7 m)
Deck width52 ft (15.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,450 (2023)
Projected traffic3,838 by 2046
Trucks29%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed31.7 mi (51 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAP 116 (il 130) over Stream built?

It was built in 2016, making it 9 years old in 2025.

What condition is FAP 116 (il 130) over Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2022.

How much traffic does FAP 116 (il 130) over Stream carry?

About 3,450 vehicles per day (2023 count), of which roughly 29% are trucks.

How long is FAP 116 (il 130) over Stream?

The structure is 35 ft (10.7 m) long with a longest span of 35 ft (10.7 m) and a deck 52 ft wide.

Who owns FAP 116 (il 130) over Stream?

It is owned by the State Highway Agency.