TR 200 over Snake Creek
FairEdgar County, Illinois · 1 MI NE of Airport · Structure no. 023421200000000
- Built
- 1958
- 67 years old, rebuilt 2011
- Condition
- Fair
- inspected October 2024
- Type
- Channel Beam
- Concrete
- Length
- 37 ft
- 1 main span
- Daily traffic
- 50
- 2019 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 200 over Snake Creek is a concrete channel beam carrying TR 200 over Snake Creek in Edgar County, Illinois. It was built in 1958 and reconstructed in 2011, so it is 67 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, roughly 4% of them trucks, projected to reach 51 by 2046. The structure is 37 ft (11.3 m) long and 22 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 200 over Snake Creek built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 2011.
What condition is TR 200 over Snake Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does TR 200 over Snake Creek carry?
About 50 vehicles per day (2019 count), of which roughly 4% are trucks.
How long is TR 200 over Snake Creek?
The structure is 37 ft (11.3 m) long with a longest span of 35 ft (10.8 m) and a deck 22 ft wide.
Who owns TR 200 over Snake Creek?
It is owned by the Town or Township Highway Agency.