US Bridges

I-88 EB to I-355 S over I-355 SB to US-34

Fair

DuPage County, Illinois · 1.1 M.E. of IL-53 · Structure no. 022997600000000

Built
1989
36 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
123 ft
1 main span
Daily traffic
17,400
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

I-88 EB to I-355 S over I-355 SB to US-34 is a prestressed concrete stringer/multi-beam or girder carrying I-88 EB to I-355 S over I-355 SB to US-34 in DuPage County, Illinois. It was built in 1989, so it is 36 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 17,400 vehicles a day, roughly 16% of them trucks, projected to reach 14,948 by 2046. The structure is 123 ft (37.5 m) long and 33 ft wide.

CarriesI-88 EB to I-355 S
CrossesI-355 SB to US-34
Location1.1 M.E. of IL-53
Coordinates41.80695, -88.05464
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating64.3 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadUnknown
Structure length123 ft (37.5 m)
Longest span121 ft (36.9 m)
Deck width33 ft (10.1 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,400 (2023)
Projected traffic14,948 by 2046
Trucks16%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-88 EB to I-355 S over I-355 SB to US-34 built?

It was built in 1989, making it 36 years old in 2025.

What condition is I-88 EB to I-355 S over I-355 SB to US-34 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does I-88 EB to I-355 S over I-355 SB to US-34 carry?

About 17,400 vehicles per day (2023 count), of which roughly 16% are trucks.

How long is I-88 EB to I-355 S over I-355 SB to US-34?

The structure is 123 ft (37.5 m) long with a longest span of 121 ft (36.9 m) and a deck 33 ft wide.

Who owns I-88 EB to I-355 S over I-355 SB to US-34?

It is owned by the State Toll Authority.