Harger RD over Salt Creek
FairDuPage County, Illinois · .4 MI N 22 Nd ST · Structure no. 022685400000000
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 144 ft
- 2 main spans
- Daily traffic
- 2,650
- 2024 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Harger RD over Salt Creek is a prestressed concrete stringer/multi-beam or girder carrying Harger RD over Salt Creek in DuPage County, Illinois. It was built in 1958, so it is 67 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,650 vehicles a day, roughly 2% of them trucks, projected to reach 1,162 by 2046. The structure is 144 ft (43.9 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Harger RD over Salt Creek built?
It was built in 1958, making it 67 years old in 2025.
What condition is Harger RD over Salt Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Harger RD over Salt Creek carry?
About 2,650 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is Harger RD over Salt Creek?
The structure is 144 ft (43.9 m) long with a longest span of 70 ft (21.3 m) and a deck 31 ft wide.
Who owns Harger RD over Salt Creek?
It is owned by the State Toll Authority.