FAU-2635 Prospect over Springbrook
FairDuPage County, Illinois · 0.4 MI N of IL-19 · Structure no. 022310200000000
- Built
- 1994
- 31 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 134 ft
- 2 main spans
- Daily traffic
- 11,400
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
FAU-2635 Prospect over Springbrook is a steel continuous stringer/multi-beam or girder carrying FAU-2635 Prospect over Springbrook in DuPage County, Illinois. It was built in 1994, so it is 31 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,400 vehicles a day, roughly 5% of them trucks, projected to reach 7,979 by 2046. The structure is 134 ft (40.8 m) long and 79 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU-2635 Prospect over Springbrook built?
It was built in 1994, making it 31 years old in 2025.
What condition is FAU-2635 Prospect over Springbrook in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does FAU-2635 Prospect over Springbrook carry?
About 11,400 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is FAU-2635 Prospect over Springbrook?
The structure is 134 ft (40.8 m) long with a longest span of 66 ft (20.1 m) and a deck 79 ft wide.
Who owns FAU-2635 Prospect over Springbrook?
It is owned by the County Highway Agency.