US Bridges

I-290 EB to Il 390 over Il 390WB to I-290SB

Good

DuPage County, Illinois · 0.04 M S of Devon · Structure no. 022055600000000

Built
2016
9 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
112 ft
1 main span
Daily traffic
3,600
2023 count
Owner
State
State Highway Agency

About this bridge

I-290 EB to Il 390 over Il 390WB to I-290SB is a prestressed concrete stringer/multi-beam or girder carrying I-290 EB to Il 390 over Il 390WB to I-290SB in DuPage County, Illinois. It was built in 2016, so it is 9 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,600 vehicles a day, roughly 9% of them trucks, projected to reach 3,232 by 2046. The structure is 112 ft (34.1 m) long and 45 ft wide.

CarriesI-290 EB to Il 390
CrossesIl 390WB to I-290SB
Location0.04 M S of Devon
Coordinates41.98854, -88.02478
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating69.3 US tons
Inventory rating50.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length112 ft (34.1 m)
Longest span103 ft (31.4 m)
Deck width45 ft (13.8 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,600 (2023)
Projected traffic3,232 by 2046
Trucks9%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-290 EB to Il 390 over Il 390WB to I-290SB built?

It was built in 2016, making it 9 years old in 2025.

What condition is I-290 EB to Il 390 over Il 390WB to I-290SB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does I-290 EB to Il 390 over Il 390WB to I-290SB carry?

About 3,600 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is I-290 EB to Il 390 over Il 390WB to I-290SB?

The structure is 112 ft (34.1 m) long with a longest span of 103 ft (31.4 m) and a deck 45 ft wide.

Who owns I-290 EB to Il 390 over Il 390WB to I-290SB?

It is owned by the State Highway Agency.