US Bridges

TR 252 over Drainage Ditch

Good

Douglas County, Illinois · 1 MI NE of Newman · Structure no. 021441900000000

Built
1980
45 years old
Condition
Good
inspected January 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
47 ft
1 main span
Daily traffic
50
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 252 over Drainage Ditch is a prestressed concrete box beam or girders - multiple carrying TR 252 over Drainage Ditch in Douglas County, Illinois. It was built in 1980, so it is 45 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 4% of them trucks, projected to reach 51 by 2046. The structure is 47 ft (14.3 m) long and 27 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTR 252
CrossesDrainage Ditch
Location1 MI NE of Newman
RouteCounty Highway 0
Coordinates39.80781, -87.97488
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length47 ft (14.3 m)
Longest span47 ft (14.3 m)
Deck width27 ft (8.3 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2022)
Projected traffic51 by 2046
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 252 over Drainage Ditch built?

It was built in 1980, making it 45 years old in 2025.

What condition is TR 252 over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2022.

How much traffic does TR 252 over Drainage Ditch carry?

About 50 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is TR 252 over Drainage Ditch?

The structure is 47 ft (14.3 m) long with a longest span of 47 ft (14.3 m) and a deck 27 ft wide.

Who owns TR 252 over Drainage Ditch?

It is owned by the Town or Township Highway Agency.