Ch 3 over Salt Creek
FairPosted for loadDe Witt County, Illinois · 2.7 MI NE Farmer Cit · Structure no. 020300600000000
- Built
- 1957
- 68 years old
- Condition
- Fair
- inspected May 2022
- Type
- Slab
- Concrete Continuous
- Length
- 104 ft
- 3 main spans
- Daily traffic
- 125
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Ch 3 over Salt Creek is a concrete continuous slab carrying Ch 3 over Salt Creek in De Witt County, Illinois. It was built in 1957, so it is 68 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 125 vehicles a day, roughly 42% of them trucks, projected to reach 152 by 2046. The structure is 104 ft (31.8 m) long and 29 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ch 3 over Salt Creek built?
It was built in 1957, making it 68 years old in 2025.
What condition is Ch 3 over Salt Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2022.
How much traffic does Ch 3 over Salt Creek carry?
About 125 vehicles per day (2022 count), of which roughly 42% are trucks.
How long is Ch 3 over Salt Creek?
The structure is 104 ft (31.8 m) long with a longest span of 39 ft (11.9 m) and a deck 29 ft wide.
Who owns Ch 3 over Salt Creek?
It is owned by the County Highway Agency.