FAP 71(IL 54) over Trib to Salt Creek
GoodDe Witt County, Illinois · 2 MI SW Farmer City · Structure no. 020200900000000
- Built
- 1995
- 30 years old
- Condition
- Good
- inspected December 2021
- Type
- Culvert
- Concrete Continuous
- Length
- 36 ft
- 2 main spans
- Daily traffic
- 2,000
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 71(IL 54) over Trib to Salt Creek is a concrete continuous culvert carrying FAP 71(IL 54) over Trib to Salt Creek in De Witt County, Illinois. It was built in 1995, so it is 30 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,000 vehicles a day, roughly 22% of them trucks, projected to reach 2,020 by 2046. The structure is 36 ft (11 m) long and 43 ft wide. If it were closed, the detour would be 42.9 mi (69 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 71(IL 54) over Trib to Salt Creek built?
It was built in 1995, making it 30 years old in 2025.
What condition is FAP 71(IL 54) over Trib to Salt Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2021.
How much traffic does FAP 71(IL 54) over Trib to Salt Creek carry?
About 2,000 vehicles per day (2023 count), of which roughly 22% are trucks.
How long is FAP 71(IL 54) over Trib to Salt Creek?
The structure is 36 ft (11 m) long with a longest span of 17 ft (5.2 m) and a deck 43 ft wide.
Who owns FAP 71(IL 54) over Trib to Salt Creek?
It is owned by the State Highway Agency.