Il 10 (fap 721) over Salt Creek
FairDe Witt County, Illinois · 4 MI E of Clinton · Structure no. 020006200000000
- Built
- 2008
- 17 years old
- Condition
- Fair
- inspected November 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 188 ft
- 2 main spans
- Daily traffic
- 1,450
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Il 10 (fap 721) over Salt Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Il 10 (fap 721) over Salt Creek in De Witt County, Illinois. It was built in 2008, so it is 17 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,450 vehicles a day, roughly 17% of them trucks, projected to reach 1,667 by 2046. The structure is 188 ft (57.3 m) long and 35 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Il 10 (fap 721) over Salt Creek built?
It was built in 2008, making it 17 years old in 2025.
What condition is Il 10 (fap 721) over Salt Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2022.
How much traffic does Il 10 (fap 721) over Salt Creek carry?
About 1,450 vehicles per day (2023 count), of which roughly 17% are trucks.
How long is Il 10 (fap 721) over Salt Creek?
The structure is 188 ft (57.3 m) long with a longest span of 93 ft (28.3 m) and a deck 35 ft wide.
Who owns Il 10 (fap 721) over Salt Creek?
It is owned by the State Highway Agency.