US Bridges

TR 68 over I-70

Fair

Cumberland County, Illinois · 1.4MI NE Eff CO Line · Structure no. 018003500000000

Built
1968
57 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
231 ft
4 main spans
Daily traffic
100
2021 count
Owner
State
State Highway Agency

About this bridge

TR 68 over I-70 is a steel continuous stringer/multi-beam or girder carrying TR 68 over I-70 in Cumberland County, Illinois. It was built in 1968, so it is 57 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 11% of them trucks, projected to reach 104 by 2046. The structure is 231 ft (70.5 m) long and 30 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesTR 68
CrossesI-70
Location1.4MI NE Eff CO Line
RouteCounty Highway 0
Coordinates39.18378, -88.34516
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 15
Structure length231 ft (70.5 m)
Longest span72 ft (21.8 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2021)
Projected traffic104 by 2046
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was TR 68 over I-70 built?

It was built in 1968, making it 57 years old in 2025.

What condition is TR 68 over I-70 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does TR 68 over I-70 carry?

About 100 vehicles per day (2021 count), of which roughly 11% are trucks.

How long is TR 68 over I-70?

The structure is 231 ft (70.5 m) long with a longest span of 72 ft (21.8 m) and a deck 30 ft wide.

Who owns TR 68 over I-70?

It is owned by the State Highway Agency.