US Bridges

TR-85 over Big Creek

Fair

Crawford County, Illinois · 1.7 MI S Eaton · Structure no. 017381500000000

Built
1998
27 years old
Condition
Fair
inspected February 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
92 ft
3 main spans
Daily traffic
75
2020 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR-85 over Big Creek is a prestressed concrete box beam or girders - multiple carrying TR-85 over Big Creek in Crawford County, Illinois. It was built in 1998, so it is 27 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 75 vehicles a day, roughly 7% of them trucks, projected to reach 76 by 2046. The structure is 92 ft (28 m) long and 28 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesTR-85
CrossesBig Creek
Location1.7 MI S Eaton
RouteCounty Highway 0
Coordinates39.07113, -87.82012
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length92 ft (28 m)
Longest span33 ft (10 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2020)
Projected traffic76 by 2046
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR-85 over Big Creek built?

It was built in 1998, making it 27 years old in 2025.

What condition is TR-85 over Big Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does TR-85 over Big Creek carry?

About 75 vehicles per day (2020 count), of which roughly 7% are trucks.

How long is TR-85 over Big Creek?

The structure is 92 ft (28 m) long with a longest span of 33 ft (10 m) and a deck 28 ft wide.

Who owns TR-85 over Big Creek?

It is owned by the Town or Township Highway Agency.