US Bridges

TR 78 over Big Creek

Fair

Crawford County, Illinois · 3 MI SE Oblong · Structure no. 017375000000000

Built
2006
19 years old
Condition
Fair
inspected February 2021
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
90 ft
3 main spans
Daily traffic
50
2020 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 78 over Big Creek is a prestressed concrete box beam or girders - multiple carrying TR 78 over Big Creek in Crawford County, Illinois. It was built in 2006, so it is 19 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, roughly 2% of them trucks, projected to reach 51 by 2046. The structure is 90 ft (27.4 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesTR 78
CrossesBig Creek
Location3 MI SE Oblong
RouteCounty Highway 0
Coordinates38.97071, -87.86591
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length90 ft (27.4 m)
Longest span30 ft (9.1 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2020)
Projected traffic51 by 2046
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 78 over Big Creek built?

It was built in 2006, making it 19 years old in 2025.

What condition is TR 78 over Big Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2021.

How much traffic does TR 78 over Big Creek carry?

About 50 vehicles per day (2020 count), of which roughly 2% are trucks.

How long is TR 78 over Big Creek?

The structure is 90 ft (27.4 m) long with a longest span of 30 ft (9.1 m) and a deck 28 ft wide.

Who owns TR 78 over Big Creek?

It is owned by the Town or Township Highway Agency.