TR325 over Poeron Creek
FairCrawford County, Illinois · 1 MI N Heathsville · Structure no. 017363400000000
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected February 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 57 ft
- 1 main span
- Daily traffic
- 20
- 2020 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR325 over Poeron Creek is a prestressed concrete box beam or girders - multiple carrying TR325 over Poeron Creek in Crawford County, Illinois. It was built in 1996, so it is 29 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 20 vehicles a day, roughly 10% of them trucks, projected to reach 20 by 2046. The structure is 57 ft (17.3 m) long and 28 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR325 over Poeron Creek built?
It was built in 1996, making it 29 years old in 2025.
What condition is TR325 over Poeron Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does TR325 over Poeron Creek carry?
About 20 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is TR325 over Poeron Creek?
The structure is 57 ft (17.3 m) long with a longest span of 54 ft (16.5 m) and a deck 28 ft wide.
Who owns TR325 over Poeron Creek?
It is owned by the Town or Township Highway Agency.