FAP-781 (ILL-33) over Dogwood Creek
GoodCrawford County, Illinois · .5 MI E Oblong · Structure no. 017002800000000
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 91 ft
- 2 main spans
- Daily traffic
- 5,400
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAP-781 (ILL-33) over Dogwood Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying FAP-781 (ILL-33) over Dogwood Creek in Crawford County, Illinois. It was built in 1996, so it is 29 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,400 vehicles a day, roughly 13% of them trucks, projected to reach 5,400 by 2046. The structure is 91 ft (27.8 m) long and 43 ft wide. If it were closed, the detour would be 62.1 mi (100 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP-781 (ILL-33) over Dogwood Creek built?
It was built in 1996, making it 29 years old in 2025.
What condition is FAP-781 (ILL-33) over Dogwood Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does FAP-781 (ILL-33) over Dogwood Creek carry?
About 5,400 vehicles per day (2023 count), of which roughly 13% are trucks.
How long is FAP-781 (ILL-33) over Dogwood Creek?
The structure is 91 ft (27.8 m) long with a longest span of 42 ft (12.9 m) and a deck 43 ft wide.
Who owns FAP-781 (ILL-33) over Dogwood Creek?
It is owned by the State Highway Agency.