I-294 NB over 135th ST
PoorCook County, Illinois · 1.3 M SE Ill 50 P26 · Structure no. 016984900000000
- Built
- 1958
- 67 years old
- Condition
- Poor
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 75 ft
- 1 main span
- Daily traffic
- 71,700
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
I-294 NB over 135th ST is a prestressed concrete stringer/multi-beam or girder carrying I-294 NB over 135th ST in Cook County, Illinois. It was built in 1958, so it is 67 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 71,700 vehicles a day, roughly 19% of them trucks, projected to reach 62,216 by 2046. The structure is 75 ft (22.9 m) long and 61 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-294 NB over 135th ST built?
It was built in 1958, making it 67 years old in 2025.
What condition is I-294 NB over 135th ST in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in April 2024.
How much traffic does I-294 NB over 135th ST carry?
About 71,700 vehicles per day (2023 count), of which roughly 19% are trucks.
How long is I-294 NB over 135th ST?
The structure is 75 ft (22.9 m) long with a longest span of 71 ft (21.6 m) and a deck 61 ft wide.
Who owns I-294 NB over 135th ST?
It is owned by the State Toll Authority.