US Bridges

I-294 SB over Sanders RD

Fair

Cook County, Illinois · 0.6 M N Ill 68 P14 · Structure no. 016974300000000

Built
1958
67 years old
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
180 ft
3 main spans
Daily traffic
67,350
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

I-294 SB over Sanders RD is a prestressed concrete continuous stringer/multi-beam or girder carrying I-294 SB over Sanders RD in Cook County, Illinois. It was built in 1958, so it is 67 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 67,350 vehicles a day, roughly 9% of them trucks, projected to reach 59,388 by 2046. The structure is 180 ft (54.9 m) long and 61 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-294 SB
CrossesSanders RD
Location0.6 M N Ill 68 P14
RouteInterstate 294
Coordinates42.14516, -87.88231
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.5 US tons
Inventory rating40.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length180 ft (54.9 m)
Longest span82 ft (25 m)
Deck width61 ft (18.6 m)
Roadway width34 ft (10.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic67,350 (2023)
Projected traffic59,388 by 2046
Trucks9%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-294 SB over Sanders RD built?

It was built in 1958, making it 67 years old in 2025.

What condition is I-294 SB over Sanders RD in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does I-294 SB over Sanders RD carry?

About 67,350 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is I-294 SB over Sanders RD?

The structure is 180 ft (54.9 m) long with a longest span of 82 ft (25 m) and a deck 61 ft wide.

Who owns I-294 SB over Sanders RD?

It is owned by the State Toll Authority.