US Bridges

I-94 (wb) over Metra & Cp Railroad

Good

Cook County, Illinois · 2 Mi. E. of I-294 · Structure no. 016903300000000

Built
2019
6 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
329 ft
3 main spans
Daily traffic
33,850
2024 count
Owner
Toll Authority
State Toll Authority

About this bridge

I-94 (wb) over Metra & Cp Railroad is a steel continuous stringer/multi-beam or girder carrying I-94 (wb) over Metra & Cp Railroad in Cook County, Illinois. It was built in 2019, so it is 6 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 33,850 vehicles a day, roughly 5% of them trucks, projected to reach 17,928 by 2046. The structure is 329 ft (100.4 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-94 (wb)
CrossesMetra & Cp Railroad
Location2 Mi. E. of I-294
RouteInterstate 94
Coordinates42.14843, -87.83942
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.8 US tons
Inventory rating48.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length329 ft (100.4 m)
Longest span138 ft (42 m)
Deck width58 ft (17.6 m)
Roadway width54 ft (16.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic33,850 (2024)
Projected traffic17,928 by 2046
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-94 (wb) over Metra & Cp Railroad built?

It was built in 2019, making it 6 years old in 2025.

What condition is I-94 (wb) over Metra & Cp Railroad in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does I-94 (wb) over Metra & Cp Railroad carry?

About 33,850 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is I-94 (wb) over Metra & Cp Railroad?

The structure is 329 ft (100.4 m) long with a longest span of 138 ft (42 m) and a deck 58 ft wide.

Who owns I-94 (wb) over Metra & Cp Railroad?

It is owned by the State Toll Authority.