Woodlawn Avenue We over Little Calumet River
GoodCook County, Illinois · 0.44 MI N US 6 · Structure no. 016804800000000
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected December 2021
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 176 ft
- 3 main spans
- Daily traffic
- 400
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Woodlawn Avenue We over Little Calumet River is a steel continuous stringer/multi-beam or girder carrying Woodlawn Avenue We over Little Calumet River in Cook County, Illinois. It was built in 2019, so it is 6 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 400 vehicles a day, roughly 12% of them trucks, projected to reach 429 by 2046. The structure is 176 ft (53.7 m) long and 36 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Woodlawn Avenue We over Little Calumet River built?
It was built in 2019, making it 6 years old in 2025.
What condition is Woodlawn Avenue We over Little Calumet River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2021.
How much traffic does Woodlawn Avenue We over Little Calumet River carry?
About 400 vehicles per day (2022 count), of which roughly 12% are trucks.
How long is Woodlawn Avenue We over Little Calumet River?
The structure is 176 ft (53.7 m) long with a longest span of 68 ft (20.7 m) and a deck 36 ft wide.
Who owns Woodlawn Avenue We over Little Calumet River?
It is owned by the City or Municipal Highway Agency.