Fullerton Parkway over Lincoln Pk Lagoon
FairCook County, Illinois · 2400 N. & 100 E. · Structure no. 016627300000000
- Built
- 2012
- 13 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 123 ft
- 1 main span
- Daily traffic
- 21,300
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Fullerton Parkway over Lincoln Pk Lagoon is a steel stringer/multi-beam or girder carrying Fullerton Parkway over Lincoln Pk Lagoon in Cook County, Illinois. It was built in 2012, so it is 13 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 21,300 vehicles a day, roughly 4% of them trucks, projected to reach 30,199 by 2046. The structure is 123 ft (37.6 m) long and 85 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fullerton Parkway over Lincoln Pk Lagoon built?
It was built in 2012, making it 13 years old in 2025.
What condition is Fullerton Parkway over Lincoln Pk Lagoon in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Fullerton Parkway over Lincoln Pk Lagoon carry?
About 21,300 vehicles per day (2022 count), of which roughly 4% are trucks.
How long is Fullerton Parkway over Lincoln Pk Lagoon?
The structure is 123 ft (37.6 m) long with a longest span of 117 ft (35.8 m) and a deck 85 ft wide.
Who owns Fullerton Parkway over Lincoln Pk Lagoon?
It is owned by the City or Municipal Highway Agency.