Monroe ST over Metra Electric RR
FairCook County, Illinois · 100S & 200E · Structure no. 016616100000000
- Built
- 1938
- 87 years old, rebuilt 2001
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 299 ft
- 6 main spans
- Daily traffic
- 9,300
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Monroe ST over Metra Electric RR is a steel continuous stringer/multi-beam or girder carrying Monroe ST over Metra Electric RR in Cook County, Illinois. It was built in 1938 and reconstructed in 2001, so it is 87 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,300 vehicles a day, roughly 8% of them trucks, projected to reach 11,514 by 2046. The structure is 299 ft (91.1 m) long and 84 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Monroe ST over Metra Electric RR built?
It was built in 1938, making it 87 years old in 2025. It was reconstructed in 2001.
What condition is Monroe ST over Metra Electric RR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Monroe ST over Metra Electric RR carry?
About 9,300 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is Monroe ST over Metra Electric RR?
The structure is 299 ft (91.1 m) long with a longest span of 61 ft (18.5 m) and a deck 84 ft wide.
Who owns Monroe ST over Metra Electric RR?
It is owned by the City or Municipal Highway Agency.