Beaubien over Lower Level Beaubien
FairCook County, Illinois · 120E & 150N to 186N · Structure no. 016613500000000
- Built
- 1956
- 69 years old, rebuilt 1976
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 378 ft
- 10 main spans
- Daily traffic
- 7,600
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Beaubien over Lower Level Beaubien is a steel stringer/multi-beam or girder carrying Beaubien over Lower Level Beaubien in Cook County, Illinois. It was built in 1956 and reconstructed in 1976, so it is 69 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,600 vehicles a day, roughly 19% of them trucks, projected to reach 7,676 by 2046. The structure is 378 ft (115.3 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Beaubien over Lower Level Beaubien built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1976.
What condition is Beaubien over Lower Level Beaubien in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Beaubien over Lower Level Beaubien carry?
About 7,600 vehicles per day (2018 count), of which roughly 19% are trucks.
How long is Beaubien over Lower Level Beaubien?
The structure is 378 ft (115.3 m) long with a longest span of 41 ft (12.6 m) and a deck 50 ft wide.
Who owns Beaubien over Lower Level Beaubien?
It is owned by the City or Municipal Highway Agency.