Central RD over W Br Salt Creek
PoorCook County, Illinois · 0.15 E Ill 53 P5 18 · Structure no. 016606100000000
- Built
- 1960
- 65 years old
- Condition
- Poor
- inspected October 2023
- Type
- Slab
- Concrete
- Length
- 28 ft
- 1 main span
- Daily traffic
- 2,350
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Central RD over W Br Salt Creek is a concrete slab carrying Central RD over W Br Salt Creek in Cook County, Illinois. It was built in 1960, so it is 65 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 2,350 vehicles a day, roughly 7% of them trucks, projected to reach 3,737 by 2046. The structure is 28 ft (8.5 m) long and 46 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Central RD over W Br Salt Creek built?
It was built in 1960, making it 65 years old in 2025.
What condition is Central RD over W Br Salt Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2023.
How much traffic does Central RD over W Br Salt Creek carry?
About 2,350 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is Central RD over W Br Salt Creek?
The structure is 28 ft (8.5 m) long with a longest span of 27 ft (8.2 m) and a deck 46 ft wide.
Who owns Central RD over W Br Salt Creek?
It is owned by the City or Municipal Highway Agency.