Carriage Way DR over Salt Creek
GoodCook County, Illinois · 0.2 S 62/0.7 E 53 · Structure no. 016606000000000
- Built
- 1970
- 55 years old, rebuilt 2013
- Condition
- Good
- inspected November 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 64 ft
- 1 main span
- Daily traffic
- 1,100
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Carriage Way DR over Salt Creek is a prestressed concrete box beam or girders - multiple carrying Carriage Way DR over Salt Creek in Cook County, Illinois. It was built in 1970 and reconstructed in 2013, so it is 55 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,100 vehicles a day, roughly 4% of them trucks, projected to reach 707 by 2046. The structure is 64 ft (19.6 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Carriage Way DR over Salt Creek built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2013.
What condition is Carriage Way DR over Salt Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.
How much traffic does Carriage Way DR over Salt Creek carry?
About 1,100 vehicles per day (2022 count), of which roughly 4% are trucks.
How long is Carriage Way DR over Salt Creek?
The structure is 64 ft (19.6 m) long with a longest span of 61 ft (18.6 m) and a deck 33 ft wide.
Who owns Carriage Way DR over Salt Creek?
It is owned by the City or Municipal Highway Agency.