Division ST over N Br Chicago Riv Can
FairCook County, Illinois · 829 W Division · Structure no. 016601500000000
- Built
- 1903
- 122 years old, rebuilt 2014
- Condition
- Fair
- inspected July 2024
- Type
- Truss - Thru
- Steel
- Length
- 267 ft
- 1 main span
- Daily traffic
- 13,400
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Division ST over N Br Chicago Riv Can is a steel truss - thru carrying Division ST over N Br Chicago Riv Can in Cook County, Illinois. It was built in 1903 and reconstructed in 2014, so it is 122 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: open, would be posted or closed except for temporary shoring.
It carries about 13,400 vehicles a day, roughly 10% of them trucks, projected to reach 13,534 by 2046. The structure is 267 ft (81.4 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Division ST over N Br Chicago Riv Can built?
It was built in 1903, making it 122 years old in 2025. It was reconstructed in 2014.
What condition is Division ST over N Br Chicago Riv Can in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Division ST over N Br Chicago Riv Can carry?
About 13,400 vehicles per day (2018 count), of which roughly 10% are trucks.
How long is Division ST over N Br Chicago Riv Can?
The structure is 267 ft (81.4 m) long with a longest span of 140 ft (42.7 m) and a deck 54 ft wide.
Who owns Division ST over N Br Chicago Riv Can?
It is owned by the City or Municipal Highway Agency.