US Bridges

Palmer Avenue over Silver Creek

Good

Cook County, Illinois · .2 MI W 25th Ave · Structure no. 016324900000000

Built
1994
31 years old
Condition
Good
inspected June 2024
Type
Slab
Concrete
Length
34 ft
1 main span
Daily traffic
450
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Palmer Avenue over Silver Creek is a concrete slab carrying Palmer Avenue over Silver Creek in Cook County, Illinois. It was built in 1994, so it is 31 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 450 vehicles a day, roughly 3% of them trucks, projected to reach 530 by 2046. The structure is 34 ft (10.4 m) long and 40 ft wide.

CarriesPalmer Avenue
CrossesSilver Creek
Location.2 MI W 25th Ave
RouteCounty Highway 0
Coordinates41.91866, -87.8693
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating97.9 US tons
Inventory rating88.6 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1 (+1 approach)
Design loadHS 20
Structure length34 ft (10.4 m)
Longest span33 ft (10 m)
Deck width40 ft (12.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic450 (2022)
Projected traffic530 by 2046
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Palmer Avenue over Silver Creek built?

It was built in 1994, making it 31 years old in 2025.

What condition is Palmer Avenue over Silver Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Palmer Avenue over Silver Creek carry?

About 450 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is Palmer Avenue over Silver Creek?

The structure is 34 ft (10.4 m) long with a longest span of 33 ft (10 m) and a deck 40 ft wide.

Who owns Palmer Avenue over Silver Creek?

It is owned by the Town or Township Highway Agency.