FAU-1635 (steger R over Plum Creek
FairCook County, Illinois · 0.35 E Burnham P2 · Structure no. 016308200000000
- Built
- 1954
- 71 years old, rebuilt 1971
- Condition
- Fair
- inspected May 2023
- Type
- Slab
- Concrete Continuous
- Length
- 115 ft
- 1 main span
- Daily traffic
- 8,300
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
FAU-1635 (steger R over Plum Creek is a concrete continuous slab carrying FAU-1635 (steger R over Plum Creek in Cook County, Illinois. It was built in 1954 and reconstructed in 1971, so it is 71 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,300 vehicles a day, roughly 2% of them trucks, projected to reach 9,141 by 2046. The structure is 115 ft (35.2 m) long and 36 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU-1635 (steger R over Plum Creek built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1971.
What condition is FAU-1635 (steger R over Plum Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does FAU-1635 (steger R over Plum Creek carry?
About 8,300 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is FAU-1635 (steger R over Plum Creek?
The structure is 115 ft (35.2 m) long with a longest span of 43 ft (13.1 m) and a deck 36 ft wide.
Who owns FAU-1635 (steger R over Plum Creek?
It is owned by the County Highway Agency.