US Bridges

Il 62 68 Dundee R over RR - Ej&e

Good

Cook County, Illinois · 0.1 M W Il 59 · Structure no. 016261300000000

Built
1997
28 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
171 ft
3 main spans
Daily traffic
33,400
2023 count
Owner
State
State Highway Agency

About this bridge

Il 62 68 Dundee R over RR - Ej&e is a prestressed concrete continuous stringer/multi-beam or girder carrying Il 62 68 Dundee R over RR - Ej&e in Cook County, Illinois. It was built in 1997, so it is 28 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 33,400 vehicles a day, roughly 4% of them trucks, projected to reach 31,613 by 2046. The structure is 171 ft (52 m) long and 97 ft wide.

CarriesIl 62 68 Dundee R
CrossesRR - Ej&e
Location0.1 M W Il 59
RouteState Highway 62
Coordinates42.11414, -88.17936
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating68.2 US tons
Inventory rating42.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3 (+4 approach)
Design loadUnknown
Structure length171 ft (52 m)
Longest span64 ft (19.4 m)
Deck width97 ft (29.6 m)
Roadway width91 ft (27.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic33,400 (2023)
Projected traffic31,613 by 2046
Trucks4%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Il 62 68 Dundee R over RR - Ej&e built?

It was built in 1997, making it 28 years old in 2025.

What condition is Il 62 68 Dundee R over RR - Ej&e in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Il 62 68 Dundee R over RR - Ej&e carry?

About 33,400 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is Il 62 68 Dundee R over RR - Ej&e?

The structure is 171 ft (52 m) long with a longest span of 64 ft (19.4 m) and a deck 97 ft wide.

Who owns Il 62 68 Dundee R over RR - Ej&e?

It is owned by the State Highway Agency.