US Bridges

Il 59 (sutton Rd) over I- 90 Adams Toll

Fair

Cook County, Illinois · 1.5 M N Il 58 · Structure no. 016259900000000

Built
1991
34 years old
Condition
Fair
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
249 ft
2 main spans
Daily traffic
31,400
2023 count
Owner
State
State Highway Agency

About this bridge

Il 59 (sutton Rd) over I- 90 Adams Toll is a prestressed concrete continuous stringer/multi-beam or girder carrying Il 59 (sutton Rd) over I- 90 Adams Toll in Cook County, Illinois. It was built in 1991, so it is 34 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 31,400 vehicles a day, roughly 10% of them trucks, projected to reach 30,603 by 2046. The structure is 249 ft (75.9 m) long and 150 ft wide.

CarriesIl 59 (sutton Rd)
CrossesI- 90 Adams Toll
Location1.5 M N Il 58
RouteState Highway 59
Coordinates42.06683, -88.19293
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.9 US tons
Inventory rating43.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length249 ft (75.9 m)
Longest span128 ft (39 m)
Deck width150 ft (45.7 m)
Roadway width121 ft (36.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic31,400 (2023)
Projected traffic30,603 by 2046
Trucks10%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Il 59 (sutton Rd) over I- 90 Adams Toll built?

It was built in 1991, making it 34 years old in 2025.

What condition is Il 59 (sutton Rd) over I- 90 Adams Toll in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does Il 59 (sutton Rd) over I- 90 Adams Toll carry?

About 31,400 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Il 59 (sutton Rd) over I- 90 Adams Toll?

The structure is 249 ft (75.9 m) long with a longest span of 128 ft (39 m) and a deck 150 ft wide.

Who owns Il 59 (sutton Rd) over I- 90 Adams Toll?

It is owned by the State Highway Agency.