US 12 20 45 NB over Santa Fe DR Et Al
FairCook County, Illinois · 0.5 M S I-55 · Structure no. 016246700000000
- Built
- 1975
- 50 years old, rebuilt 2022
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 2,745 ft
- 30 main spans
- Daily traffic
- 64,200
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
US 12 20 45 NB over Santa Fe DR Et Al is a steel continuous stringer/multi-beam or girder carrying US 12 20 45 NB over Santa Fe DR Et Al in Cook County, Illinois. It was built in 1975 and reconstructed in 2022, so it is 50 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 64,200 vehicles a day, roughly 13% of them trucks, projected to reach 32,421 by 2046. The structure is 2,745 ft (836.7 m) long and 42 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 12 20 45 NB over Santa Fe DR Et Al built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2022.
What condition is US 12 20 45 NB over Santa Fe DR Et Al in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does US 12 20 45 NB over Santa Fe DR Et Al carry?
About 64,200 vehicles per day (2021 count), of which roughly 13% are trucks.
How long is US 12 20 45 NB over Santa Fe DR Et Al?
The structure is 2,745 ft (836.7 m) long with a longest span of 290 ft (88.4 m) and a deck 42 ft wide.
Who owns US 12 20 45 NB over Santa Fe DR Et Al?
It is owned by the State Highway Agency.