I- 55 WB Stevenson over Loomis & Fuller Sts
GoodCook County, Illinois · 0.9 M SW I-94 · Structure no. 016096800000000
- Built
- 1964
- 61 years old, rebuilt 2000
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 542 ft
- 7 main spans
- Daily traffic
- 75,500
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I- 55 WB Stevenson over Loomis & Fuller Sts is a steel continuous stringer/multi-beam or girder carrying I- 55 WB Stevenson over Loomis & Fuller Sts in Cook County, Illinois. It was built in 1964 and reconstructed in 2000, so it is 61 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 75,500 vehicles a day, roughly 8% of them trucks, projected to reach 74,690 by 2046. The structure is 542 ft (165.2 m) long and 72 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I- 55 WB Stevenson over Loomis & Fuller Sts built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2000.
What condition is I- 55 WB Stevenson over Loomis & Fuller Sts in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does I- 55 WB Stevenson over Loomis & Fuller Sts carry?
About 75,500 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is I- 55 WB Stevenson over Loomis & Fuller Sts?
The structure is 542 ft (165.2 m) long with a longest span of 101 ft (30.7 m) and a deck 72 ft wide.
Who owns I- 55 WB Stevenson over Loomis & Fuller Sts?
It is owned by the State Highway Agency.