Western Ave over Cal Sg Chnl&rr&brdwy
FairCook County, Illinois · 1.5 M N Il 83 · Structure no. 016077700000000
- Built
- 1966
- 59 years old, rebuilt 2020
- Condition
- Fair
- inspected March 2024
- Type
- Truss - Thru
- Steel
- Length
- 1,117 ft
- 1 main span
- Daily traffic
- 5,750
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Western Ave over Cal Sg Chnl&rr&brdwy is a steel truss - thru carrying Western Ave over Cal Sg Chnl&rr&brdwy in Cook County, Illinois. It was built in 1966 and reconstructed in 2020, so it is 59 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,750 vehicles a day, roughly 11% of them trucks, projected to reach 7,020 by 2046. The structure is 1,117 ft (340.4 m) long and 68 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Western Ave over Cal Sg Chnl&rr&brdwy built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 2020.
What condition is Western Ave over Cal Sg Chnl&rr&brdwy in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Western Ave over Cal Sg Chnl&rr&brdwy carry?
About 5,750 vehicles per day (2022 count), of which roughly 11% are trucks.
How long is Western Ave over Cal Sg Chnl&rr&brdwy?
The structure is 1,117 ft (340.4 m) long with a longest span of 246 ft (74.9 m) and a deck 68 ft wide.
Who owns Western Ave over Cal Sg Chnl&rr&brdwy?
It is owned by the State Highway Agency.