US Bridges

Willow RD over I-294 Tri State Toll

Fair

Cook County, Illinois · 2.4 M S Il 68 · Structure no. 016053100000000

Built
1958
67 years old, rebuilt 2008
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
235 ft
2 main spans
Daily traffic
38,500
2022 count
Owner
State
State Highway Agency

About this bridge

Willow RD over I-294 Tri State Toll is a prestressed concrete continuous stringer/multi-beam or girder carrying Willow RD over I-294 Tri State Toll in Cook County, Illinois. It was built in 1958 and reconstructed in 2008, so it is 67 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 38,500 vehicles a day, roughly 8% of them trucks, projected to reach 47,167 by 2046. The structure is 235 ft (71.7 m) long and 155 ft wide.

CarriesWillow RD
CrossesI-294 Tri State Toll
Location2.4 M S Il 68
Coordinates42.10652, -87.86817
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.5 US tons
Inventory rating44 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length235 ft (71.7 m)
Longest span72 ft (21.9 m)
Deck width155 ft (47.2 m)
Roadway width132 ft (40.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic38,500 (2022)
Projected traffic47,167 by 2046
Trucks8%
Lanes on structure10
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Willow RD over I-294 Tri State Toll built?

It was built in 1958, making it 67 years old in 2025. It was reconstructed in 2008.

What condition is Willow RD over I-294 Tri State Toll in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does Willow RD over I-294 Tri State Toll carry?

About 38,500 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is Willow RD over I-294 Tri State Toll?

The structure is 235 ft (71.7 m) long with a longest span of 72 ft (21.9 m) and a deck 155 ft wide.

Who owns Willow RD over I-294 Tri State Toll?

It is owned by the State Highway Agency.