39th ST (pershing) over I- 90 94 Dan Ryan
FairCook County, Illinois · 1.7 M S I-55 · Structure no. 016039800000000
- Built
- 1962
- 63 years old, rebuilt 2001
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 297 ft
- 5 main spans
- Daily traffic
- 15,800
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
39th ST (pershing) over I- 90 94 Dan Ryan is a steel continuous stringer/multi-beam or girder carrying 39th ST (pershing) over I- 90 94 Dan Ryan in Cook County, Illinois. It was built in 1962 and reconstructed in 2001, so it is 63 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,800 vehicles a day, roughly 15% of them trucks, projected to reach 14,645 by 2046. The structure is 297 ft (90.5 m) long and 98 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 39th ST (pershing) over I- 90 94 Dan Ryan built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2001.
What condition is 39th ST (pershing) over I- 90 94 Dan Ryan in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does 39th ST (pershing) over I- 90 94 Dan Ryan carry?
About 15,800 vehicles per day (2022 count), of which roughly 15% are trucks.
How long is 39th ST (pershing) over I- 90 94 Dan Ryan?
The structure is 297 ft (90.5 m) long with a longest span of 72 ft (21.9 m) and a deck 98 ft wide.
Who owns 39th ST (pershing) over I- 90 94 Dan Ryan?
It is owned by the State Highway Agency.