Il 43 SB (harlem) over RR - Cn
FairCook County, Illinois · 0.1 M S I-55 · Structure no. 016031700000000
- Built
- 1966
- 59 years old, rebuilt 1990
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 714 ft
- 11 main spans
- Daily traffic
- 39,000
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Il 43 SB (harlem) over RR - Cn is a steel continuous stringer/multi-beam or girder carrying Il 43 SB (harlem) over RR - Cn in Cook County, Illinois. It was built in 1966 and reconstructed in 1990, so it is 59 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 39,000 vehicles a day, roughly 10% of them trucks, projected to reach 21,564 by 2046. The structure is 714 ft (217.7 m) long and 50 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Il 43 SB (harlem) over RR - Cn built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1990.
What condition is Il 43 SB (harlem) over RR - Cn in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Il 43 SB (harlem) over RR - Cn carry?
About 39,000 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is Il 43 SB (harlem) over RR - Cn?
The structure is 714 ft (217.7 m) long with a longest span of 73 ft (22.4 m) and a deck 50 ft wide.
Who owns Il 43 SB (harlem) over RR - Cn?
It is owned by the State Highway Agency.