I- 90 94 Nwb Jfk over Kedzie & Belmont Avs
FairCook County, Illinois · 3 M NW Il 64 · Structure no. 016012200000000
- Built
- 1958
- 67 years old, rebuilt 1994
- Condition
- Fair
- inspected July 2024
- Type
- Girder and Floorbeam System
- Steel Continuous
- Length
- 204 ft
- 2 main spans
- Daily traffic
- 103,400
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I- 90 94 Nwb Jfk over Kedzie & Belmont Avs is a steel continuous girder and floorbeam system carrying I- 90 94 Nwb Jfk over Kedzie & Belmont Avs in Cook County, Illinois. It was built in 1958 and reconstructed in 1994, so it is 67 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 103,400 vehicles a day, roughly 6% of them trucks, projected to reach 98,374 by 2046. The structure is 204 ft (62.2 m) long and 73 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I- 90 94 Nwb Jfk over Kedzie & Belmont Avs built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 1994.
What condition is I- 90 94 Nwb Jfk over Kedzie & Belmont Avs in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does I- 90 94 Nwb Jfk over Kedzie & Belmont Avs carry?
About 103,400 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is I- 90 94 Nwb Jfk over Kedzie & Belmont Avs?
The structure is 204 ft (62.2 m) long with a longest span of 145 ft (44.2 m) and a deck 73 ft wide.
Who owns I- 90 94 Nwb Jfk over Kedzie & Belmont Avs?
It is owned by the State Highway Agency.