US Bridges

Il 171 EB (archer) over 79th ST WB

Good

Cook County, Illinois · 0.8 M E US 45 · Structure no. 016003800000000

Built
2021
4 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
88 ft
1 main span
Daily traffic
21,500
2022 count
Owner
State
State Highway Agency

About this bridge

Il 171 EB (archer) over 79th ST WB is a prestressed concrete stringer/multi-beam or girder carrying Il 171 EB (archer) over 79th ST WB in Cook County, Illinois. It was built in 2021, so it is 4 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 21,500 vehicles a day, roughly 15% of them trucks, projected to reach 16,362 by 2046. The structure is 88 ft (26.9 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIl 171 EB (archer)
Crosses79th ST WB
Location0.8 M E US 45
Coordinates41.74728, -87.84167
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.8 US tons
Inventory rating59.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length88 ft (26.9 m)
Longest span79 ft (24 m)
Deck width53 ft (16.1 m)
Roadway width50 ft (15.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic21,500 (2022)
Projected traffic16,362 by 2046
Trucks15%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Il 171 EB (archer) over 79th ST WB built?

It was built in 2021, making it 4 years old in 2025.

What condition is Il 171 EB (archer) over 79th ST WB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Il 171 EB (archer) over 79th ST WB carry?

About 21,500 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is Il 171 EB (archer) over 79th ST WB?

The structure is 88 ft (26.9 m) long with a longest span of 79 ft (24 m) and a deck 53 ft wide.

Who owns Il 171 EB (archer) over 79th ST WB?

It is owned by the State Highway Agency.