FAU 7711 (ch 27) over Kickapoo Creek
GoodColes County, Illinois · 0.5 Mi. SE Mattoon · Structure no. 015343300000000
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected January 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 65 ft
- 1 main span
- Daily traffic
- 2,600
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
FAU 7711 (ch 27) over Kickapoo Creek is a prestressed concrete box beam or girders - multiple carrying FAU 7711 (ch 27) over Kickapoo Creek in Coles County, Illinois. It was built in 2021, so it is 4 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,600 vehicles a day, roughly 2% of them trucks, projected to reach 2,374 by 2046. The structure is 65 ft (19.8 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 7711 (ch 27) over Kickapoo Creek built?
It was built in 2021, making it 4 years old in 2025.
What condition is FAU 7711 (ch 27) over Kickapoo Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does FAU 7711 (ch 27) over Kickapoo Creek carry?
About 2,600 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is FAU 7711 (ch 27) over Kickapoo Creek?
The structure is 65 ft (19.8 m) long with a longest span of 62 ft (18.8 m) and a deck 32 ft wide.
Who owns FAU 7711 (ch 27) over Kickapoo Creek?
It is owned by the County Highway Agency.