US Bridges

TR 318 over Hog Branch

Poor

Coles County, Illinois · 2 MI NE of Oakland · Structure no. 015342100000000

Built
2009
16 years old
Condition
Poor
inspected January 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
45 ft
1 main span
Daily traffic
50
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 318 over Hog Branch is a prestressed concrete box beam or girders - multiple carrying TR 318 over Hog Branch in Coles County, Illinois. It was built in 2009, so it is 16 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 50 vehicles a day, roughly 8% of them trucks, projected to reach 51 by 2046. The structure is 45 ft (13.8 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTR 318
CrossesHog Branch
Location2 MI NE of Oakland
RouteCounty Highway 0
Coordinates39.67788, -88.00442
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck4 PoorAdvanced section loss, deterioration, spalling or scour.
Superstructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.4 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length45 ft (13.8 m)
Longest span20 ft (6.1 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2024)
Projected traffic51 by 2046
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 318 over Hog Branch built?

It was built in 2009, making it 16 years old in 2025.

What condition is TR 318 over Hog Branch in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in January 2024.

How much traffic does TR 318 over Hog Branch carry?

About 50 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is TR 318 over Hog Branch?

The structure is 45 ft (13.8 m) long with a longest span of 20 ft (6.1 m) and a deck 28 ft wide.

Who owns TR 318 over Hog Branch?

It is owned by the Town or Township Highway Agency.