US Bridges

Ch 7 over Riley Creek

Fair

Coles County, Illinois · 2 MI W Charleston · Structure no. 015323900000000

Built
1981
44 years old
Condition
Fair
inspected January 2025
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
130 ft
2 main spans
Daily traffic
375
2024 count
Owner
County
County Highway Agency

About this bridge

Ch 7 over Riley Creek is a prestressed concrete box beam or girders - multiple carrying Ch 7 over Riley Creek in Coles County, Illinois. It was built in 1981, so it is 44 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 375 vehicles a day, roughly 7% of them trucks, projected to reach 606 by 2046. The structure is 130 ft (39.6 m) long and 24 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCh 7
CrossesRiley Creek
Location2 MI W Charleston
RouteCounty Highway 0
Coordinates39.48994, -88.23184
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length130 ft (39.6 m)
Longest span64 ft (19.5 m)
Deck width24 ft (7.4 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic375 (2024)
Projected traffic606 by 2046
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ch 7 over Riley Creek built?

It was built in 1981, making it 44 years old in 2025.

What condition is Ch 7 over Riley Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does Ch 7 over Riley Creek carry?

About 375 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is Ch 7 over Riley Creek?

The structure is 130 ft (39.6 m) long with a longest span of 64 ft (19.5 m) and a deck 24 ft wide.

Who owns Ch 7 over Riley Creek?

It is owned by the County Highway Agency.