Ch 5(FAS 676) over Hurricane Creek
FairColes County, Illinois · 1.5 MI S of Hutton · Structure no. 015321200000000
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected December 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 108 ft
- 1 main span
- Daily traffic
- 75
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Ch 5(FAS 676) over Hurricane Creek is a prestressed concrete box beam or girders - multiple carrying Ch 5(FAS 676) over Hurricane Creek in Coles County, Illinois. It was built in 1977, so it is 48 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 75 vehicles a day, roughly 15% of them trucks, projected to reach 101 by 2046. The structure is 108 ft (32.9 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ch 5(FAS 676) over Hurricane Creek built?
It was built in 1977, making it 48 years old in 2025.
What condition is Ch 5(FAS 676) over Hurricane Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Ch 5(FAS 676) over Hurricane Creek carry?
About 75 vehicles per day (2024 count), of which roughly 15% are trucks.
How long is Ch 5(FAS 676) over Hurricane Creek?
The structure is 108 ft (32.9 m) long with a longest span of 55 ft (16.8 m) and a deck 24 ft wide.
Who owns Ch 5(FAS 676) over Hurricane Creek?
It is owned by the County Highway Agency.